ADSS cable is up to 144 optical fibres in jelly-filled loose tubes, laid up around a central non-metallic strength member. The cable is water blocked, aramid yarn reinforced and polyethylene sheathed. Surface printing for the cable includes sequential length marking at one-metre intervals. Mainly installed at existing 220kV or lower voltage power lines . Two Jacket and stranded loose tube design .
Ref. Outer Diameter (mm) |
Ref. Weight (kg/km) |
Rec. Daily Max. Working Tension (kN) |
Max Allowable Working Tension (kN) |
Break Strength (kN) |
Strength Member CSA (mm2) |
Modulus of Elasticity CSA (kN/mm2) |
Heat Expansion Coefficient (x10- 6/K) |
Suitable Span (NESC Standard,m) |
||||
PE Jacket |
AT Jacket |
A | B | C | D | |||||||
12.5 | 125 | 136 | 1.5 | 4 | 10 | 4.6 | 7.6 | 1.8 | 160 | 100 | 140 | 100 |
13.0 | 132 | 142 | 2.25 | 6 | 15 | 7.6 | 8.3 | 1.5 | 230 | 150 | 200 | 150 |
13.3 | 137 | 148 | 3.0 | 8 | 20 | 10.35 | 9.45 | 1.3 | 300 | 200 | 290 | 200 |
13.6 | 145 | 156 | 3.6 | 10 | 24 | 13.8 | 10.8 | 1.2 | 370 | 250 | 350 | 250 |
13.8 | 147 | 159 | 4.5 | 12 | 30 | 14.3 | 11.8 | 1.0 | 420 | 280 | 400 | 280 |
14.5 | 164 | 177 | 5.4 | 15 | 36 | 18.4 | 13.6 | 0.9 | 480 | 320 | 460 | 320 |
14.9 | 171 | 185 | 6.75 | 18 | 45 | 22.0 | 16.4 | 0.6 | 570 | 380 | 550 | 380 |
15.1 | 179 | 193 | 7.95 | 22 | 53 | 26.4 | 18.0 | 0.3 | 670 | 460 | 650 | 460 |
15.5 | 190 | 204 | 9.0 | 26 | 60 | 32.2 | 19.1 | 0.1 | 750 | 530 | 750 | 510 |
Production process as follows:
adss optic cable
1.Are you the real manufacturer?
Us. We are the real manufacturer with 15 year’s history.
2.What’s the MOQ?
Us. The MOQ of Fiber Optic cable is 1km.
3.What’s delivery time?
Us. The general delivery time is 5-7 days after order confirmed. It depends on the order quantity.
4.How to Store the Optical Fiber Cable Properly?
Us. Store the drum indoor before using, the drum should place sideways not on the end.
5. Can you supply customized products and logo?
Yes. We supply OEM service. You can send us your drawing.
6.What’s your payment terms?
Us. We accept T/T,L/C,Western Union,D/P etc. 30% in advance and 70% before shipment.